Saturday 23 May 2015

We dropped by JE to take a look at the WIP. We try to do it at least once a week, just so also to keep track of what is happening and Jeremiah says so that we can immediately rectify any works that need to be corrected.

However, we spent a very short time yesterday as the tiler was mixing cement for the floor tiles, the windows person was fixing up the windows, someone was smoking and the place was quite dusty. Jeremiah, having 2 young children of his own, was concerned with K breathing in all the toxic air. And so after checking out the bathroom door design and getting the lock sets for the bedroom and main doors today, we decided to go by again.

This time, there wasn't anyone around. The new windows are up except for the ones at the balcony. The bedrooms have frosted windows while the ones at the living room and kitchen are clear. We can already see the difference it is from the previous state where it was dark and I thought there wasn't enough light coming into the unit. The air-con trunking is up, the electrical wiring's ready to have lights fitted, the first coat of paint is done and so what's left is the carpentry, vinyl flooring and the last coat of paint. 

Here's a peek of the tiled up kitchen, common and master bathroom.

No comments:

Post a Comment