Thursday 28 May 2015

I went on a vessel visit with a few of my colleagues today and it was such an experience! It's our company's own chemical vessel and we had to take a 1/2 hour boat ride out and thankfully, instead of a rope ladder, we had a gangway to climb up on. 

We had a tour of the ship and by the time we returned to office, it was just in time to pack up my stuff and lock the room door. 

The hubs decided to drop by our new place again after work and we saw that the vinyl floor tiles were already in the house, ready to be laid. The oven and hood have been fitted into the cabinet kitchen and the toilet bowl has been fitted in the common bathroom. Some other works that have yet to be completed are the balcony and storeroom floor tiles, window grille for the balcony window, everything else for the master bathroom and the rest of the common bathroom, fixing of the kitchen sink, stove, master bedroom wardrobe, buffet cabinet, shoe rack and touch ups here and there. The service provider will be going down tomorrow to install the fibre broadband. And I'm really hoping that the handover can be carried out by end of next week.

We will order the storage bed this Saturday and 1 more item in our list will be the sofa set.

Here's a peek of our living room with the window and grilles up. We're loving the choice that we made for the colour. It definitely brightens up the house. Although we no longer have a 'view' to speak of, I'm glad we have trees just outside every room window. :)

No comments:

Post a Comment